West Tapps | Allan Yorke Park Sidewalk - Project BL#11
$825,000.00
Performed improvements to the following:
• 880LF of curb, gutter, and 5-foot wide sidewalk along west side of West Tapps Hwy. East
• Provided storm water collection and quality treatment system as required by the 2015 PC Stormwater Manual
• Converted existing overhead utilities to a joint underground trench
• Illumination at intersections (provided by Intolight).
Owner:
City of Bonney Lake
9002 Main Street, E., P.O. Box 7380
Bonney Lake, WA 98391
253.447.4336
www.citybonneylake.org
John Woodcock, Engineer
woodcockj@ci.bonney-lake.wa.us